ABOUT SHOP ARCHITECTS

Owner Name

Shop Architects

Owner Representative

N/A

Project Overall Contract Value

$3.96 Million

Overall Project Size

24,000 SF

Architect

Shop Architects

MEP Engineer

Schnackel Engineers, Inc.

Structural

Silman Associates

Lighting

Dot Dash

Project Scope:

The Shop Architects project was a full office fit-out with detail-oriented design. OTCA was involved in this project from start to finish, including all MEP’s, Lutron Lighting control systems, glass office partitions, polished concrete flooring, carpet, finishes including window shades, painting, specialty Barclay Center wall, specialty appliances, individual client bathrooms, toilet partitions, millwork, specialty workshops and client areas. Additionally included were new fan coil units and supplemental AC as well as specialty exhaust fans.

The 10th floor office, our second project for shop architects, was a full office fit out with detailed oriented design. The architectural blackened metal staircase was a signature design connecting the 10th and 11th floors. It was installed while maintaining full office activity. Challenges included the creation of new floor slab openings incorporating new steel designs within existing terracotta.

Contact With Us

We are very proud of the service we provide and stand by every product we carry. Read our testimonials from our happy customers.